Crowded basement
It got a little crowded on the basement slab. We assembled the floor trusses first, in order to have them ready, and then had to stack them all diagonally in the middle while we built the ICF around. This photo shows the basement ICF almost complete, including a band of steel around the perimeter of the ICF. Another band of steel will be added 20″ above this one, and this upper band will have anchors cast into the concrete for holding the weight of the floor. (Left to right: Tim, Helmut, Tom, David.)